Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13758445
- Product Categories
- Friendly Links
- home > Supply > BWS constant pressure water supply equipment, Guangzhou frequency of water supply equipment, water supply equipment life models, automatic pressurization equipment, high-floor secondary water supply equipment, variable-speed pump
BWS constant pressure water supply equipment, Guangzhou frequency of water supply equipment, water supply equipment life models, automatic pressurization equipment, high-floor secondary water supply equipment, variable-speed pump
Information Name: | BWS constant pressure water supply equipment, Guangzhou frequency of water supply equipment, water supply equipment life models, automatic pressurization equipment, high-floor secondary water supply equipment, variable-speed pump |
Published: | 2015-05-05 |
Validity: | 999 |
Specifications: | DWS |
Quantity: | 50.00 |
Price Description: | |
Detailed Product Description: | Overall Summary BWS constant pressure water supply equipment using the most advanced microcomputer control technology, energy-efficient water supply system and water pump drive and supplemented reliable electrical components made. Device according to the pipe network water and water pressure changes, the implementation of variable speed through computer testing, operation and feedback process to the pump motor to maintain constant pressure to meet water requirements. Compared with the traditional towers, water tanks, pneumatic and other water supply, constant pressure water supply equipment uses a stainless steel food hygiene rating as indoor tanks, both reliability and water quality, construction costs, economic operation, the system intelligence and other aspects have a significant advantage. In recent years it has been widely used in various construction of water supply systems, spray irrigation and industrial and agricultural production. Categories differ according to the configuration of the pump station number and line sections of different materials to make the following classification: a control two stainless frequency of water supply equipment: two main pump switch turns work (in eight hours for a period, the first initial first stop), the peak period may running, no side pump. Line part of the all stainless steel pipe; a control two steel pipe frequency of water supply equipment: two main pump switch turns work (in eight hours for a period, the first initial first stop), the peak can be run simultaneously without sub pump. Steel pipe pipe part; a control three stainless frequency of water supply equipment: two main pump switch turns work (in eight hours for a period, the first initial first stop), the peak can be run simultaneously, a sub pump (non-water the peak of the sub pump run regulator). Stainless steel pipe line section; a control three steel pipe frequency of water supply equipment: two main pump switch turns work (in eight hours for a period, the first initial first stop), the peak can be run simultaneously, a sub pump (not Deputy peak water pump operation regulator). Steel pipe pipe part; a controlled four stainless frequency of water supply equipment: three main pump rotation switching operation (to eight hours for a period, the first initial first stop), the peak can be run simultaneously, a sub pump (non-water the peak of the sub pump run regulator). Stainless steel pipe line section; a controlled four steel pipe frequency of water supply equipment: three main pump switch turns work (in eight hours for a period of the first initial first stop), the peak can be run simultaneously, a sub pump (not Deputy peak water pump operation regulator). Line part of steel pipe. Note: You can change the actual needs of appropriate material pump according to the user. The system works through intelligent central processor PID control, the outlet pipe line pressure controller sample pressure and converted into corresponding electrical signals sent to the PLC, PLC received the actual pipe network pressure signal set by the user pressure value, use value control deviation output frequency to change the motor output power. When a pump running at full speed still fall short of user-set pressure, then switch to variable frequency pump frequency operation, start another pump soft and low frequency operation by the inverter. If the actual pressure is greater than the set pressure, the pump will automatically stop frequency to achieve variable water supply. If little water, it stops all initiatives by the auxiliary pump and pressure tank constant work. Features 1, the water quality is more clean. Water tank made of stainless steel manufacturing, compared to the traditional underground pool or roof pond, stainless steel sink has no rust, good sealing characteristics, to eliminate the rust and dust and other insect contamination of water storage. 2, pressure is stable. The device uses advanced closed-loop control system can automatically adjust the pump speed or start and stop the pump according to the water pipe network changes, so that the pipe outlet pressure remains constant, the accuracy of the normal water pressure can be controlled within ± 0.1 to ± 0.2MPa within range ). To overcome the traditional pressure water pressure fluctuations, the pump starts and frequent deficiencies. 3, energy efficient. The device can be adjusted according to user changes in water pump start and stop the pump speed or constant pressure purpose, energy-saving effect is obvious, the energy efficiency of up to 60%. 4, simple operation. The device is equipped with automatic control mode and the LCD screen. Users can set their own working conditions needed to automatically work to achieve automatic unattended equipment. 5, the protection function. With perfect overload, short circuit, overvoltage, undervoltage, phase, overcurrent, short circuit, water, water and other automatic protection. In exceptional circumstances can signal alarm, self-test and fault diagnosis. 6, extend the life of pumps and motors. To achieve more than one pump cycle soft start, to make the grid and pipeline network impact-free, and take turns running (to open the first stop) mode, thus prolonging the life of pumps and motors. 7, reliable operation. Control components are used internationally renowned brand accessories, effectively reducing the failure rate. And when a pump failure can not run, the system automatically shield start the standby pump failure pump operation. Applications constant pressure water supply equipment generally used in combination tanks (tank) to use, less than the recommended amount of municipal water or unstable or no water supply in the following situations use. 1, domestic water: as high-rise buildings, residential areas, villas, hospitals, schools, stadiums, golf courses, airports, military, factories and living quarters and other occasions 2 fire water, hot and cold water systems: such as schools, hotels, inns, hotels and so hot and cold water booster system 3, irrigation sprinkler: occasions such as parks, water parks, farms, orchards and other water 4. Production and Construction: such as factory production and processing, washing apparatus, food and beverage processing, construction sites and water booster installation Notes First, installation considerations in order not to affect the life of the product and reduce its performance, the installation site must be selected, taking care to mounting direction or the surrounding space. Accessories such as equipment is sent to the demand-side approach does not require the company responsible for the installation, schematic assembly unit in strict accordance with our offer. Second, the pump and associated piping installation 1, the equipment should be installed indoors or in sheltered outdoor locations, the ambient temperature is between 5 ℃ ~ 40 ℃, relative humidity less than 90%, and should have good ventilation, can not exist around easily Burning explosive or corrosive gas or liquid, the venue is not higher than 2000 meters above sea level. 2, matching pumps water pump water pumps should be installed in accordance with manufacturer's installation instructions, peripheral piping and equipment into the water pipe connections (water pipe or pond water pipes) must be in strict accordance with the attached equipment into the water pipe sizes arrangements should do peripheral pipe diameter ≥ equipment into the water pipe inside diameter. 3, equipment layout and installation diagram or the relevant national norms, there must be in strict accordance with the construction drawings design drawings. 4, pump suction way should be self-leveling, non-self-fill water must have a reliable guarantee. 5. If the device is mounted on the board, recommended damping device, otherwise you will bring noise or vibration. Third, the installation of this series frequency control cabinet inverter control system according to the different power have the appropriate weight, a ceiling must be used when appropriate handling, side fall or collision damage caused by some components. Should also note the following: 1, the surrounding environment control system is large, the installation must avoid direct sunlight, high temperature, humidity of the place, the environment temperature should be -10 ℃ ~ 40 ℃, relative humidity less than 90% , not susceptible of condensation / frost and so on. 2, the installation site should avoid oil mist, flammable gas liquids, cotton dust, etc. 3. Tighten control cabinet. The use of floor-standing control cabinet, screws must be used vertically and firmly fixed on the base of pre-configured, while ensuring distance control cabinet base and the ground is not less than 10 cm; such as the use wall-mounted, must ensure that sufficient efforts suspension and the wall must not be too wet. 4, wiring, banned all off-cuts, screws and other metal objects fall into the control cabinet. Otherwise easily lead to obstacles control system malfunction to set serious consequences of damage. 5, due to the frequency control system is equipped with a frequency converter, therefore, contain high-frequency components of the control system of the input and output circuits, the use of communication devices in the vicinity of the control cabinet may bring against electromagnetic interference, then you can install preaching radio noise filter or noise filter to reduce interference. Third, the system wiring diagram of the circuit layout. Please refer to the attached device control schematic. If not understand, please contact me. In order to avoid damage to the device. 1. Wiring precautions 1.1 power access, and wiring of all motors must be connected to the standard configuration and wiring method requires absolutely right, if there is an error would be likely to cause significant damage to the equipment. The following is the power and wire size table, please strict selection of quality standard wires, or may cause damage to property according to power equipment. 1.2 All power input, and connected to the motor line scripts please use sleeved solderless terminals. 1.3 cable is connected to the control circuit terminals, use shielded or twisted wire. And with the main circuit wiring and power circuits separate, later operation, if the need to change the wiring, wait 10 minutes after a power failure was observed after the operation can be carried out inside the inverter frequency control charge indicator goes off. Otherwise it will cause an electric shock! 1.4 is connected to the motor cable must be in strict accordance with the standard configuration. 1.5 is connected to the control circuit wiring scripts use 1.5mm2 single strand wire from less than 1,000 meters, where the wires connected to the pressure sensor to use at least 0.75mm2 shielded cable connection distance of not more than 300 meters, sewage control of cable to use at least 0.75 mm2 sheath cables, connectors, not more than 300 meters distance. 2. Grounding Considerations 2.1 In order to prevent electric shock, we must ensure that this series of frequency control cabinet and motor grounded, grounding resistance 10Ω or less guaranteed. 2.2 Ground control cabinet, connect a dedicated ground terminal, do not use screws and other cabinet members, and the yellow and green lines with a professional identity. 2.3 motor grounding terminal using a 4-core cable in a line, the ground under control. 2.4 main circuit wiring, configure according to relevant regulations depending on the motor starts. After commissioning a matter, pump test run, and before the pump starts to prepare the manner defined above connected lines and power lines and signal lines entering the pump test run the program. Before the pump starts, be sure to check whether the work to do the following: 1.1 Check the pump inlet and outlet base and is fixed; 1.2 pump is filled with water. Irrigation as follows:. A device with tap water or if the water level is slightly higher than the pool pump directly connected, only need to open the inlet valve while closing the outlet valve and open the pump fill valve (exhaust valve), so naturally filled water pump until the exhaust valve at the water overflows. b. If the device is slightly lower than the pump suction from the water level inside the tank must be installed in the inlet end of the valve. Unscrew the pump fill valve (drain valve) when irrigation, and the need to open the inlet valve, close the water valve. With a fill valve (drainage valve) can no longer be poured at the can. 1.3 grid voltage, phase and frequency with the number on the pump motor label conform; 1.4 inlet valve is fully open the road; the outlet valve is in a closed state; after the completion of the above preparations, you can pump test run step. First of all: whether to test the pump before the normal operation, make sure the controller is in manual mode. Switching mode is under the control of state power open, you can switch a long press A / M key for approximately six seconds. Make sure to manual mode, enter pump test procedures, the specific test steps are as follows: Then, move the motor, check the steering is consistent with the label on the pump turned → If not, swap any two of the motor terminal box wiring position can; if turn right, you can start the pump → regulated outlet valve to the user until the desired pressure. Determine the pump can be started normally and no leaks and other phenomena, enter the user parameter setting procedure. Second, commissioning controller debug controller adjustment is complete equipment. Before commissioning Make sure the pump inlet valve, instrument valve is turned on, it may damage the pump or not properly debugged. Before commissioning in strict accordance with the following steps: 1. Key functions NO WATER: anhydrous LED, and when the water tank, red. PUMP1 #: 1st pump. PUMP2 #: 2 pump. PUMP3 #: 3 pumps. AUXILIARY PUMP: auxiliary pump. FAULT: fault indicator, when a failure occurs, the red light. ON / OFF: Start / stop the corresponding pump (using the manual operation, automatic operation is invalid when the pump is stopped press this button to start the pump frequency operation, press this button to stop the pump frequency operation when the pump is running.) . Operation indicator: When frequency operation red light, green light does not shine inverter running, stop running. A / M: Manual / Automatic switching key (long press for about six seconds); also enter the parameter rewrite state (ENT) key. ▲ ▼: Setting Function menu parameters, or increase or decrease the number pad flip when modifying the state. ??: Shift key when modifying parameters. ESC: Cancel the changes and return key to reset a fault or failure. A: The controller usually display interface B: Function Menu C: into the "system parameters", the default password: 0000 D: "System Parameters" interface, including 50 parameter options. See detailed parameter definition and setting range. E: enter the "Run Time" function interface. F: into the "Fault recording" function interface. G: enter "Water Mode", the default password: 0000. H, I: "Water Mode" function interface. There are four periods options, peak water A, peak water B, A regular water supply and regular water supply B. Refer to the system works. 1: Displays the current sync frequency. 2: Remote monitoring PC software use. Select the multi-unit time. Usually not. 3: Displays the set pressure (ie the pressure to maintain a constant) and the actual pressure (ie pressure gauge to the controller of the current water collected pressure) 4: Displays the date and time. 5: current operating mode (manual / automatic), by pressing the A / M / ENT switch 6: Function Menu: including the "System Parameters" and "run time" "failure record" "Water supply mode." Confirm password required password entry screen, enter the "System parameters" and "Water Mode": 7. 8: "System Parameters" interface that includes 50 parameters, specific names, etc. See parameter definitions and setting range. 9: Go to the "Run Time" function interface, you can view all pump run time. Press the "up" "down" key to turn to 10: Go to "Fault recording" function interface, you can view the system failure during operation recorded. Up to ten. Press the "up" "down" key to turn to. 11: Go to "Water Mode" screen when you need to enter a password. 12: Go to "Water Mode" function interface. Related presentations on water mode Refer to system schematic presentation. 2, the state interpretation 3, parameter definition and setting range 4, the controller commissioning guide in understanding the control panel and after checking the correct line, according to the following method of adjusting system parameters. 5, gauge wiring and calibration methods such as measuring gauges are pairwise three lines with a multimeter, the resistance value of the terminals where the 3rd largest of any access controller and the fifth terminal, the remaining one take control of 1 No. terminals connected into the system parameters, based on the actual gauge pressure gauge range selection range on the controller. Take a good line, you must check the gauge wiring methods are correct. Specific detection method as follows: manually open the pump, observe the pressure gauge trends are consistent with the actual pressure value is displayed on the controller, if consensus proves correct wiring; if the value of the gauge is on the rise, and the control panel display Pressure display is on the decline, then prove access terminal 3 and the ground terminal of the 5th line reversed, exchange the two cable. After the wiring is correct, enter the pressure calibration procedure. Specific operational procedures: first manually open Renyiyitai pump, then the gauge readings actually enter into the press to confirm, pay attention to the same value can not be calibrated twice. It represents misuse operation twice, for example: pressure gauge reading after 0.23Mpa enter 0.23 to confirm press ENT. The next time you can not enter calibration is 0.23, you must enter another value recalibration. It is worth noting that, when the pressure gauge at zero pressure state calibration, do not zero, calibrated to a 0.01, or manually play up the pressure after the correction. 6, when the frequency of the frequency calibration frequency inverter and control panel display when the displayed values ??do not match, just need to drive input to the controller in real-time readings press to confirm, pay attention to the same value can not be calibrated twice. It represents misuse operation twice, for example: the drive after reading press ENT to confirm after 42Hz input 42Hz. Next time will not be entered in the calibration 42Hz, you must enter another frequency recalibration. |
Admin>>>
You are the 6976 visitor
Copyright © GuangDong ICP No. 10089450, Water Technology Co., Ltd. in Guangzhou City Hengsheng All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6976 visitor
Copyright © GuangDong ICP No. 10089450, Water Technology Co., Ltd. in Guangzhou City Hengsheng All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility